Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/19527
Title: | The identification and management of cost significant work packages | Authors: | Gng, Hoon Liang. | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 1993 | Abstract: | This dissertation is concerned with the identification and management of cost significant work packages which is an amalgamation of individual cost significant items of similar nature. The objectives are twofold. | URI: | http://hdl.handle.net/10356/19527 | Research Centres: | Centre for Advanced Construction Studies | Rights: | NANYANG TECHNOLOGICAL UNIVERSITY | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_77.pdf Restricted Access | 16.53 MB | Adobe PDF | View/Open |
Page view(s) 10
891
Updated on Mar 27, 2024
Download(s)
4
Updated on Mar 27, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.