Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/19546
Title: | Measurement of construction productivity : application and computer simulation | Authors: | Cheang, Yew Kee. Lew, Chee Hoong. |
Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 1997 | Abstract: | This research work deals with the analyses of the productivities of three of the main trades involved in the construction industry. The three trades that are being studied are (i) bar bending and fixing (ii) concreting (iii) formworking. The quantities produced in each trade divided by the amount of labour used will give the basic productivity for the trade of the particular period in study. | URI: | http://hdl.handle.net/10356/19546 | Research Centres: | Centre for Advanced Construction Studies | Rights: | NANYANG TECHNOLOGICAL UNIVERSITY | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_8.pdf Restricted Access | 29.93 MB | Adobe PDF | View/Open |
Page view(s) 20
734
Updated on Mar 28, 2024
Download(s)
5
Updated on Mar 28, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.