Title: | A two-phase GA model for resource-contrained project scheduling | Authors: | Weng, Haijie | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 2005 | Source: | Weng, H. (2005). A two-phase GA model for resource-contrained project scheduling. Master’s thesis, Nanyang Technological University, Singapore. | Abstract: | Project scheduling has a tremendous effect on the performance of a construction project. In project scheduling, problems can arise when each activity can be started at different time points and the resources needed by the activities are limited. Moreover, activities have required conditions to be met, such as precedence relationships, resource demands, etc. To resolve these problems, a two-phase GA (genetic algorithms) model was proposed in this research, in which both the effects of time-cost trade-off and resource scheduling were taken into account. A GA-based time-cost trade-off analysis was adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints. | Description: | 159 p. | URI: | https://hdl.handle.net/10356/46732 | DOI: | 10.32657/10356/46732 | Schools: | School of Civil and Environmental Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | open | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CEE_THESES_21.pdf | 17 MB | Adobe PDF | View/Open |
Page view(s) 20
623
Updated on Mar 27, 2024
Download(s) 20
302
Updated on Mar 27, 2024
Google ScholarTM
Check
Altmetric
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.