Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/10253
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lim, Pengxiong. | en_US |
dc.contributor.author | Ong, Diana Sue Yee. | en_US |
dc.contributor.author | Teoh, Sze Lin. | en_US |
dc.date.accessioned | 2008-09-24T07:41:41Z | - |
dc.date.available | 2008-09-24T07:41:41Z | - |
dc.date.copyright | 2006 | en_US |
dc.date.issued | 2006 | - |
dc.identifier.uri | http://hdl.handle.net/10356/10253 | - |
dc.description.abstract | The use of Just-In-Time (JIT) inventory systems is widespread amongst manufacturing firms in the world. Nevertheless, there has not been a universal definition of JIT. Moreover, there is little research evidence suggesting a positive relationship between the elements of JIT and the financial performance of firms. In this paper, we have investigated on the effects of 3 JIT elements; Flexible Manufacturing System (FMS), Pull Production Process (PPP) and Cellular Layout (CL) on firm performance. | en_US |
dc.rights | Nanyang Technological University | en_US |
dc.subject | DRNTU::Business::Operations management::Inventory control | - |
dc.title | Empirical study on the relationship of flexible manufacturing system, cellular layout and pull production process with return on assets and inventory turnover. | en_US |
dc.type | Final Year Project (FYP) | en_US |
dc.contributor.supervisor | Bhatnagar, Rohit | en_US |
dc.contributor.school | Nanyang Business School | en_US |
item.fulltext | With Fulltext | - |
item.grantfulltext | restricted | - |
Appears in Collections: | NBS Student Reports (FYP/IA/PA/PI) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
NBS-REPORTS_2821.pdf Restricted Access | 171.9 kB | Adobe PDF | View/Open |
Page view(s)
541
Updated on Apr 16, 2025
Download(s)
3
Updated on Apr 16, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.