Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/11867
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBirsen Zeyrek.en_US
dc.date.accessioned2008-09-25T06:31:09Z-
dc.date.available2008-09-25T06:31:09Z-
dc.date.copyright2004en_US
dc.date.issued2004-
dc.identifier.urihttp://hdl.handle.net/10356/11867-
dc.description.abstractThis report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a reference for future new tunneling projects within similar conditions.en_US
dc.format.extent163 p.-
dc.language.isoen-
dc.rightsNanyang Technological Universityen_US
dc.subjectDRNTU::Engineering::Civil engineering::Geotechnical-
dc.titleGround settlement of NATM tunnels at contract T06 of Singapore DTSS projecten_US
dc.typeThesisen_US
dc.contributor.supervisorAshraf Mohamed Hefnyen_US
dc.contributor.schoolSchool of Civil and Environmental Engineeringen_US
dc.description.degreeMaster of Science (Geotechnical Engineering)en_US
item.grantfulltextrestricted-
item.fulltextWith Fulltext-
Appears in Collections:CEE Theses
Files in This Item:
File Description SizeFormat 
CEE-THESES_14.pdf
  Restricted Access
35.83 MBAdobe PDFView/Open

Page view(s) 10

845
Updated on Sep 19, 2024

Download(s) 50

21
Updated on Sep 19, 2024

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.