Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/11867
Title: | Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project | Authors: | Birsen Zeyrek. | Keywords: | DRNTU::Engineering::Civil engineering::Geotechnical | Issue Date: | 2004 | Abstract: | This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a reference for future new tunneling projects within similar conditions. | URI: | http://hdl.handle.net/10356/11867 | Schools: | School of Civil and Environmental Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CEE-THESES_14.pdf Restricted Access | 35.83 MB | Adobe PDF | View/Open |
Page view(s) 10
841
Updated on Sep 9, 2024
Download(s) 50
21
Updated on Sep 9, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.