Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/11975
Title: | Program to estimate delay cost due to road works | Authors: | Pawitra, Edwin. | Keywords: | DRNTU::Engineering::Civil engineering::Transportation | Issue Date: | 2002 | Abstract: | This study attempts to develop a computerized model called DCEP to estimate the delay cost incurred by road users as a result of lane closure, particularly on arterial roads for Singapore traffic. | URI: | http://hdl.handle.net/10356/11975 | Schools: | School of Civil and Environmental Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CEE-THESES_236.pdf Restricted Access | 8.3 MB | Adobe PDF | View/Open |
Page view(s) 50
572
Updated on Mar 16, 2025
Download(s)
4
Updated on Mar 16, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.