Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/12216
Title: | Fuzzy multiple criteria decision system for contractor selection | Authors: | Singh, Dharmendra | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 2006 | Source: | Singh, D. (2006). Fuzzy multiple criteria decision system for contractor selection. Doctoral thesis, Nanyang Technological University, Singapore. | Abstract: | Though the construction industry is one of the most dynamic, challenging and rewarding industries, it is also one that is full of uncertainties and associated risks. The proliferation of contracting firms due to low entry barriers to the industry, cutthroat competition as a result of shrinking construction markets in developed and developing countries and the unique nature of construction have led many construction clients to a crucial dilemma and that is which contractor to select for their jobs. As contractors play a pivotal role in any construction project, the crucial task of the selection by the client of ‘the right contractor for the right project’, therefore, constitutes the critical fulcrum upon which the overall success or otherwise of a construction project is precariously balanced. | URI: | https://hdl.handle.net/10356/12216 | DOI: | 10.32657/10356/12216 | Schools: | School of Civil and Environmental Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | open | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CEE-THESES_55.pdf | 23.31 MB | Adobe PDF | View/Open |
Page view(s) 20
667
Updated on Oct 15, 2024
Download(s) 10
407
Updated on Oct 15, 2024
Google ScholarTM
Check
Altmetric
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.