Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/12235
Title: Soil heave and pile heave caused by pile installation
Authors: Gao, Shan
Keywords: DRNTU::Engineering::Civil engineering::Geotechnical
Issue Date: 2000
Abstract: Pile installation will lead to vertical and horizontal soil movements around the pile. The vertical soil movements will cause heave of piles which have already been installed in the vicinity. As a result, tensile force may be induced in the existing piles. The horizontal soil movements induced by pile installation may also cause the deflection of existing piles and induce bending moments in such piles.
URI: http://hdl.handle.net/10356/12235
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Theses

Files in This Item:
File Description SizeFormat 
CEE-THESES_72.pdf
  Restricted Access
17.19 MBAdobe PDFView/Open

Page view(s)

288
checked on Oct 25, 2020

Download(s)

8
checked on Oct 25, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.