Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/13097
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lew, Vincent Wei Sern. | en_US |
dc.date.accessioned | 2008-10-20T07:04:27Z | - |
dc.date.available | 2008-10-20T07:04:27Z | - |
dc.date.copyright | 1999 | en_US |
dc.date.issued | 1999 | en_US |
dc.identifier.uri | http://hdl.handle.net/10356/13097 | - |
dc.description.abstract | This dissertation is an attempt to apply construction simulation tools in project planning for public housing repair and retrofitting projects, or more commonly termed, upgrading projects. Critical activities within a typical upgrading project were identified. These were the production, erection, wet joint construction and architectural finishes works in the precast Space Adding Item (SAI). | en_US |
dc.format.extent | 306 p. | en_US |
dc.language.iso | en | en_US |
dc.subject | DRNTU::Engineering::Civil engineering::Construction management | en_US |
dc.title | Simulation study of construction processes in repair and retrofitting of public housing | en_US |
dc.type | Thesis | en_US |
dc.contributor.supervisor | Jahidul Alum | en_US |
dc.contributor.school | School of Civil and Structural Engineering | en_US |
dc.description.degree | Master of Science (International Construction Management) | en_US |
item.fulltext | With Fulltext | - |
item.grantfulltext | restricted | - |
Appears in Collections: | CEE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
LewVincentWeiSern1999.pdf Restricted Access | Main report | 38.44 MB | Adobe PDF | View/Open |
Page view(s) 50
531
Updated on Mar 29, 2024
Download(s)
7
Updated on Mar 29, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.