Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/13500
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChia, Chu Wei.en_US
dc.date.accessioned2008-10-20T08:21:21Z-
dc.date.available2008-10-20T08:21:21Z-
dc.date.copyright1998en_US
dc.date.issued1998en_US
dc.identifier.urihttp://hdl.handle.net/10356/13500-
dc.description.abstractIn the semiconductor manufacturing, implementing shopfloor scheduling and control systems is critical and crucial in maintaining high utilisation of expensive equipment and improving throughput and at the same time performing in a lean environment with low WIP and short cycle time. In order to tackle high work-in-process (WIP) in a semiconductor assembly and test company, an electronic kanban based shopfloor control system has been implemented.en_US
dc.format.extent104 p.en_US
dc.language.isoenen_US
dc.subjectDRNTU::Engineering::Manufacturing::Inventory controlen_US
dc.subjectDRNTU::Engineering::Manufacturing::Production managementen_US
dc.titleProduction inventory management using electronic kanbanen_US
dc.typeThesisen_US
dc.contributor.supervisorSivakumar, Appa Iyeren_US
dc.contributor.schoolSchool of Mechanical and Production Engineeringen_US
dc.description.degreeMaster of Science (Computer Integrated Manufacturing)en_US
item.grantfulltextrestricted-
item.fulltextWith Fulltext-
Appears in Collections:MAE Theses
Files in This Item:
File Description SizeFormat 
CHIA_CHU_WEI_1998.pdf
  Restricted Access
12.58 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.