Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/146570
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKong, Dongxianen_US
dc.contributor.authorLatrubesse, Edgardo Manuelen_US
dc.contributor.authorMiao, Chiyuanen_US
dc.contributor.authorZhou, Ruien_US
dc.date.accessioned2021-03-01T08:57:10Z-
dc.date.available2021-03-01T08:57:10Z-
dc.date.issued2019-
dc.identifier.citationKong, D., Latrubesse, E. M., Miao, C., & Zhou, R. (2020). Morphological response of the Lower Yellow River to the operation of Xiaolangdi Dam, China. Geomorphology, 350, 106931-. doi:10.1016/j.geomorph.2019.106931en_US
dc.identifier.issn0169-555Xen_US
dc.identifier.urihttps://hdl.handle.net/10356/146570-
dc.description.abstractThe morphodynamics of the Lower Yellow River (LYR) has been impacted by intense dam-induced changes over the past few decades. Here we present results on the morphological impacts produced on the LYR by the construction and operation of Xiaolangdi Dam, whose construction was completed in 1999. We used multi-temporal remotely sensed images and geomorphological parameters, and developed a systematic and universal river morphology extraction framework to investigate changes in the planform of the LYR between 1987 and 2017. The morphological changes were assessed by identifying seven sub-reaches (R1 to R7) along ∼860 km of the LYR. The multichannel upper reaches of the LYR exhibited more marked changes in anabranching and braid-channel ratio, sinuosity, and lateral migration rate than the lower reaches, which are characterized by a single channel pattern. Sandbars in the upper reaches (R1–R3) underwent degradation after the beginning of operation of Xiaolangdi Dam, while the reverse was seen in the lower reaches (R6–R7). The area of overlap between the 1987 channel mask and the channel mask at different times throughout the study decreased gradually over the study period, indicating intense channel migration. The operation of Xiaolangdi Dam prevented the river from running dry but also from suffering floods, while extending the duration of the low/medium stage flows. These actions account for the morphological changes in the LYR. Despite the fact that effective discharge did not change significantly after the Xiaolangdi Dam began operating, it became compressed into a shorter range of annual discharge variability (i.e., larger low-level discharges and shorter rising-smaller floods stages). Our integrated assessment shows a significant amount of water flow energy has been consumed by multiple planform adjustments in the upper reaches of LYR, while local siltation is the main issue in the sinuous but laterally stable lower reaches.en_US
dc.language.isoenen_US
dc.relation.ispartofGeomorphologyen_US
dc.rights© 2020 The Authors. Published by Elsevier B.V. This is an open-access article distributed under the terms of the Creative Commons Attribution License.en_US
dc.subjectEngineering::Environmental engineeringen_US
dc.titleMorphological response of the Lower Yellow River to the operation of Xiaolangdi Dam, Chinaen_US
dc.typeJournal Articleen
dc.contributor.schoolAsian School of the Environmenten_US
dc.contributor.researchEarth Observatory of Singaporeen_US
dc.identifier.doi10.1016/j.geomorph.2019.106931-
dc.description.versionPublished versionen_US
dc.identifier.volume350en_US
dc.subject.keywordsLower Yellow Riveren_US
dc.subject.keywordsMorphologyen_US
item.grantfulltextopen-
item.fulltextWith Fulltext-
Appears in Collections:ASE Journal Articles

SCOPUSTM   
Citations 10

38
Updated on Mar 23, 2023

Web of ScienceTM
Citations 10

34
Updated on Mar 27, 2023

Page view(s)

191
Updated on Mar 29, 2023

Download(s) 50

73
Updated on Mar 29, 2023

Google ScholarTM

Check

Altmetric


Plumx

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.