Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/15902
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLoh, Pei Shan.-
dc.date.accessioned2009-05-18T09:22:48Z-
dc.date.available2009-05-18T09:22:48Z-
dc.date.copyright2009en_US
dc.date.issued2009-
dc.identifier.urihttp://hdl.handle.net/10356/15902-
dc.description.abstractThe objectives of this project are to first analyze the different types of risks a nuclear power plant may cause. Secondly, to consider the factors affecting the selection of site and the different areas of Singapore suitable for siting a nuclear power plant and assess the advantages and disadvantages of these sites. Lastly, to select the suitable site and provide reasons for selecting it.en_US
dc.format.extent98 p.en_US
dc.language.isoenen_US
dc.rightsNanyang Technological University-
dc.subjectDRNTU::Engineering::Environmental engineering::Environmental protectionen_US
dc.titleRisk assessment of siting a nuclear power planten_US
dc.typeFinal Year Project (FYP)en_US
dc.contributor.supervisorFan Sau Cheongen_US
dc.contributor.schoolSchool of Civil and Environmental Engineeringen_US
dc.description.degreeBachelor of Engineering (Civil)en_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)
Files in This Item:
File Description SizeFormat 
LohPeiShan09.pdf
  Restricted Access
1.44 MBAdobe PDFView/Open

Page view(s) 50

517
Updated on Apr 18, 2025

Download(s)

11
Updated on Apr 18, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.