Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19380
Title: Project management system on piling project (bored-cast-in-place pile)
Authors: Ng, Lay Hua.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1997
Abstract: The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discussed and an application of the system in a completed project is studied. The major process of the bored pile installation is translated into a flow diagram using Powersim Software and each variable used is formulated. The model is simulated for 100 times and a simulated construction period is obtained. A sensitivity analysis of the model is also carried out on the allocation of resources.
URI: http://hdl.handle.net/10356/19380
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_17.pdf
  Restricted Access
16.57 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.