Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/19382
Title: | Simulation of the management method for producing bridge elements in precasting yard | Authors: | Ooi, Jit Cheow. | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 1997 | Abstract: | This thesis concentrates on the study of using computer simulation in the management of a precasting yard producing bridge elements. For this purpose, a computer model simulation was built to simulate the management of material flow and logistic planning pertaining to the precasting yard such as beam casting operation, beam launching operation, site storage constraints and resources required for each activity. The simulation model is used as a vehicle for experimentation, in a way to demonstrate the likely effects of various activities on to the project duration as well as on to one another. The results obtained are then analysed and tested against actual data. | URI: | http://hdl.handle.net/10356/19382 | Research Centres: | Centre for Advanced Construction Studies | Rights: | NANYANG TECHNOLOGICAL UNIVERSITY | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_19.pdf Restricted Access | 9.02 MB | Adobe PDF | View/Open |
Page view(s) 50
554
Updated on May 7, 2025
Download(s)
5
Updated on May 7, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.