Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19382
Title: Simulation of the management method for producing bridge elements in precasting yard
Authors: Ooi, Jit Cheow.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1997
Abstract: This thesis concentrates on the study of using computer simulation in the management of a precasting yard producing bridge elements. For this purpose, a computer model simulation was built to simulate the management of material flow and logistic planning pertaining to the precasting yard such as beam casting operation, beam launching operation, site storage constraints and resources required for each activity. The simulation model is used as a vehicle for experimentation, in a way to demonstrate the likely effects of various activities on to the project duration as well as on to one another. The results obtained are then analysed and tested against actual data.
URI: http://hdl.handle.net/10356/19382
Research Centres: Centre for Advanced Construction Studies 
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_19.pdf
  Restricted Access
9.02 MBAdobe PDFView/Open

Page view(s) 50

554
Updated on May 7, 2025

Download(s)

5
Updated on May 7, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.