Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/19470
Title: | Key issues in BOT project packaging | Authors: | Cheong, Heng Keong. | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 1996 | Abstract: | Due to the demand for rapid infrastructure development world-wide, the BOT concept of project development has gained a firm foothold on both the government and the private sector. Governments favour it either to cut down on public spending or due to lack of funds. The private sector see it as a means to enter a domain previously dominated by the governments and enlarging their business base. | URI: | http://hdl.handle.net/10356/19470 | Research Centres: | Centre for Advanced Construction Studies | Rights: | NANYANG TECHNOLOGICAL UNIVERSITY | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_27.pdf Restricted Access | 12.72 MB | Adobe PDF | View/Open |
Page view(s) 50
492
Updated on Mar 26, 2024
Download(s)
4
Updated on Mar 26, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.