Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19473
Title: Simulation study of a major bridge rehabilitation project in Sri Lanka
Authors: Cheah, Francis Kok Seng.
Ng, Boon Hoo.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1996
Abstract: The objective of this thesis is to study, evaluate and attempt to quantify the effects of the site conditions, resources output, availability and reliability on the productivity rates of a major bridge rehabilitation project. The project that was chosen was the rehabilitation of a major bridge in Sri Lanka called the New Kelani Bridge. In particular the methodology was used to conduct a post-mortem analysis of a sub-system of the whole project that resulted in a delay in the project.
URI: http://hdl.handle.net/10356/19473
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_30.pdf
  Restricted Access
12.85 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.