Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/19474
Title: | Dynamic simulation in the management of a large basement construction project in Singapore | Authors: | Khor, Eng Leong. Ng, Wan Ming. |
Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 1996 | Abstract: | This dissertation attempts to demonstrate the usefulness of using a dynamic mulation modeling software, Powersim, to generate the strategic project management control baseline for a large basement construction project. Large construction projects in Singapore are generally complex, fast-tracked and operate on tight budgets. Current project management techniques such as PERT Program Evaluation and Review Technique) and CPM (Critical Path Method) are relatively "static" and not very user-friendly for the monitoring, controlling, and assessing of the impacts of construction changes on project control baselines. | URI: | http://hdl.handle.net/10356/19474 | Research Centres: | Centre for Advanced Construction Studies | Rights: | NANYANG TECHNOLOGICAL UNIVERSITY | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_31.pdf Restricted Access | 17.61 MB | Adobe PDF | View/Open |
Page view(s) 50
570
Updated on Mar 24, 2025
Download(s)
12
Updated on Mar 24, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.