Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19475
Title: Variability and accuracy of contractors' cost estimates
Authors: Khor, Yew Chai.
Tan, June Yew Chai.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1996
Abstract: There are four (4) main objectives in this project. First, a preview of the project main cost components and factors affecting the accuracy of construction cost. Secondly, the analysis of variances of contractors' estimation. Lastly, a discussion of the other factors influencing cost accuracy of projects.
URI: http://hdl.handle.net/10356/19475
Research Centres: Centre for Advanced Construction Studies 
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_32.pdf
  Restricted Access
34.77 MBAdobe PDFView/Open

Page view(s) 50

622
Updated on May 7, 2025

Download(s)

5
Updated on May 7, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.