Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19477
Title: Establishment of cash flow model for defence building projects
Authors: Leong, Choi Mui.
Tan, Yok Khoon.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1996
Abstract: This project studies the development of cash flow forecasting models for defence building projects. We have limited the scope to camp complex development contracts which generally refer to the construction of offices, training facilities, accommodation blocks and canteens.
URI: http://hdl.handle.net/10356/19477
Research Centres: Centre for Advanced Construction Studies 
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_34.pdf
  Restricted Access
29.64 MBAdobe PDFView/Open

Page view(s) 50

587
Updated on Mar 15, 2025

Download(s)

3
Updated on Mar 15, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.