Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19480
Title: Productivity aspects of bored piling operations in Singapore
Authors: Lee, Hong Keow.
Khalid Mahmood.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1996
Abstract: This study describes a new productivity performance indicator for bored piling operations in Singapore. The study presents productivity performance measurement of 10 different piling projects in Singapore. These projects include commercial, industrial, residential and utility developments. These piling projects have been used as case studies for the proposed productivity performance indicator. The report also presents variation of productivity performance among various projects. The effect of different factors on the productivity performance of a project have also been presented. The study recommends a base value of productivity performance for comparison among various projects and different companies.
URI: http://hdl.handle.net/10356/19480
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_37.pdf
  Restricted Access
16.6 MBAdobe PDFView/Open

Page view(s) 50

447
Updated on Nov 24, 2020

Download(s) 50

3
Updated on Nov 24, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.