Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/19487
Title: | Project management system analysis and redesign | Authors: | Tay, Tiak Poh. | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 1995 | Abstract: | The main purpose of the dissertation is to modify the model project management developed by Dr. G. A.Britton and J. Parker using the Viable System Model, so that it is suitable for the Singapore construction industry. | URI: | http://hdl.handle.net/10356/19487 | Research Centres: | Centre for Advanced Construction Studies | Rights: | NANYANG TECHNOLOGICAL UNIVERSITY | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_44.pdf Restricted Access | 15.48 MB | Adobe PDF | View/Open |
Page view(s) 50
560
Updated on Mar 28, 2025
Download(s)
11
Updated on Mar 28, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.