Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/19497
Title: | Computer-based methods for cost estimation of underground electrical cable installation in Singapore | Authors: | Ho, Teck Hong. Woon, Hin Juan. |
Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 1995 | Abstract: | This thesis attempts to quantify the productivity aspect of conduits laying works under the PUB's power cable installation program. The objectives are two fold. Firstly, to study the environmental factors affecting the productivity of the works and quantify them formally and, secondly, to develop computer models for estimating the cost of such works. | URI: | http://hdl.handle.net/10356/19497 | Rights: | NANYANG TECHNOLOGICAL UNIVERSITY | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_54.pdf Restricted Access | 10.1 MB | Adobe PDF | View/Open |
Page view(s) 50
327
Updated on Jan 18, 2021
Download(s) 50
5
Updated on Jan 18, 2021
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.