Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19522
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNanthakumar Sivagurunathanen_US
dc.date.accessioned2009-12-14T05:53:00Z
dc.date.available2009-12-14T05:53:00Z
dc.date.copyright1994en_US
dc.date.issued1994
dc.identifier.urihttp://hdl.handle.net/10356/19522
dc.description.abstractPrivatisation of large infrastructure projects has been becoming more common. This study focuses on the report for The Second Stage Expressway System in Bangkok did by Asian Development Bank (ADB). It identifies the risks associated to the project. An independent spreadsheet model was developed to the check accuracy of the ADB's report.en_US
dc.format.extent271 p.en_US
dc.language.isoen
dc.rightsNANYANG TECHNOLOGICAL UNIVERSITYen_US
dc.subjectDRNTU::Engineering::Civil engineering::Construction management
dc.titleRisk management of privatised projectsen_US
dc.typeThesisen_US
dc.contributor.supervisorTiong, Robert Lee Kongen_US
dc.description.degreeMaster of Science (International Construction Management)en_US
dc.contributor.researchCentre for Advanced Construction Studiesen_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:CACS Theses
Files in This Item:
File Description SizeFormat 
CACS_THESES_72.pdf
  Restricted Access
13.58 MBAdobe PDFView/Open
CACS_THESES2_72.pdf
  Restricted Access
30.58 MBAdobe PDFView/Open

Page view(s) 10

303
Updated on Jan 23, 2021

Download(s)

10
Updated on Jan 23, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.