Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19527
Title: The identification and management of cost significant work packages
Authors: Gng, Hoon Liang.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1993
Abstract: This dissertation is concerned with the identification and management of cost significant work packages which is an amalgamation of individual cost significant items of similar nature. The objectives are twofold.
URI: http://hdl.handle.net/10356/19527
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_77.pdf
  Restricted Access
16.53 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.