Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19528
Title: Time/cost performance ratio modelling for estimation and project evaluation
Authors: Goh, Ngan Hong.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1993
Abstract: The objective of this study is to develop a theoretical background for defining and measuring performance of construction projects in relation to both time and cost effectiveness and to investigate and analyze the contract performance with respect to public institutional building and road projects in Singapore in the last ten years (1981 to 1990). It also attempts to formulate methods by which the results of the study can be used for improving performance of similar building and road projects in future by setting realistic time and cost targets.
URI: http://hdl.handle.net/10356/19528
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_78.pdf
  Restricted Access
10.8 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.