dc.description.abstractThis research develops a process-based risk management framework for sponsors of BOT (Build-Operate-Transfer) power projects. The essence of this research is that risk management should be proactive in nature and focus on during project promotion. The framework comprises the three activities which the sponsor undergoes concurrently in order to effectively manage project risks: (i) Structuring Management Responses; (ii) Risk Modeling and Analysis; and (iii) Pre-Project Planning.en_US
dc.format.extent146 p.-
dc.language.isoen-
dc.rightsNANYANG TECHNOLOGICAL UNIVERSITYen_US
dc.subjectDRNTU::Engineering::Industrial engineering::Project management-
dc.titleRisk management of Build-Operate-Transfer (B.O.T.) power projects : a framework for project sponsorsen_US
dc.typeThesisen_US
dc.contributor.schoolSchool of Mechanical and Production Engineeringen_US
dc.description.degreeMaster of Engineering (MPE)en_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:MAE Theses
Files in This Item:
File Description SizeFormat 
MAE_THESES_26.pdf
  Restricted Access
22.92 MBAdobe PDFView/Open

Page view(s) 50

357
Updated on Feb 27, 2021

Download(s)

12
Updated on Feb 27, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.