Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/19995
Title: Using modeling and simulation for scheduling of test cell in an electronic company
Authors: Cheng, Yau Tong.
Keywords: DRNTU::Engineering::Manufacturing
Issue Date: 1996
Abstract: The primary objective of scheduling is to enable a company to deliver quality parts to the customer on time. However, there are many conflicting factors, both internal and external, that affect the drive to reach this objective. It is almost impossible to deliver quality parts to all the customers on time at all times while maintaining maximum machine utilization and minimum inventory. The management will have to weigh between urgent parts and normal parts; between clearing deliquent line items and meeting due-date of current parts; between major customers and minor customers.
URI: http://hdl.handle.net/10356/19995
Rights: NANYANG TECHNOLOGICAL UNIVERSITY
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:MAE Theses

Files in This Item:
File Description SizeFormat 
MAE_THESES_87.pdf
  Restricted Access
30.53 MBAdobe PDFView/Open

Page view(s) 10

246
checked on Oct 22, 2020

Download(s) 10

5
checked on Oct 22, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.