Title: | Plant maintenance system | Authors: | Lee, Carmen Mun Yi Lim, Yijin Neha Saoji |
Keywords: | DRNTU::Business::Operations management | Issue Date: | 2010 | Abstract: | This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section also contains other information such as the scope, tasks and criteria of success, etc. of the project. The “Proposed Solution” section goes through the steps that the group have undergone in order to arrive at the proposed solution. This section includes three steps of analysis namely the problem, requirements and feasibility analysis, which will be followed by the logical design and physical design of the proposed system. Finally, this report will conclude with an evaluation of the group’s recommendations and a summary of how the information system can add value to KB Associates Pte Ltd. | URI: | http://hdl.handle.net/10356/21212 | Schools: | Nanyang Business School | Organisations: | KB Associates Pte Ltd | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | NBS Student Reports (FYP/IA/PA/PI) |
Page view(s) 50
514
Updated on Mar 15, 2025
Download(s)
8
Updated on Mar 15, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.