Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/21212
Title: Plant maintenance system
Authors: Lee, Carmen Mun Yi
Lim, Yijin
Neha Saoji
Keywords: DRNTU::Business::Operations management
Issue Date: 2010
Abstract: This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section also contains other information such as the scope, tasks and criteria of success, etc. of the project. The “Proposed Solution” section goes through the steps that the group have undergone in order to arrive at the proposed solution. This section includes three steps of analysis namely the problem, requirements and feasibility analysis, which will be followed by the logical design and physical design of the proposed system. Finally, this report will conclude with an evaluation of the group’s recommendations and a summary of how the information system can add value to KB Associates Pte Ltd.
URI: http://hdl.handle.net/10356/21212
Schools: Nanyang Business School 
Organisations: KB Associates Pte Ltd
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:NBS Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
B4716.pdf
  Restricted Access
9.29 MBAdobe PDFView/Open

Page view(s) 50

514
Updated on Mar 15, 2025

Download(s)

8
Updated on Mar 15, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.