Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/36127
Title: | Managing and handling dead on arrival returns of original design manufacturer manufactured products at a regional site | Authors: | Chan, Weng Kin. | Keywords: | DRNTU::Engineering::Industrial engineering::Supply chain | Issue Date: | 2007 | Abstract: | This project looks at the available options as well as the implementation of a refurbishment process in order to reduce the scrap costs of dead on arrival products that are manufactured by the original design manufacturers and the recovery of costs through re-marketing the refurbished products. | Description: | 57 p. | URI: | http://hdl.handle.net/10356/36127 | Schools: | School of Mechanical and Aerospace Engineering | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MAE_THESES_83.pdf Restricted Access | 5.55 MB | Adobe PDF | View/Open |
Page view(s) 50
477
Updated on Mar 20, 2025
Download(s)
1
Updated on Mar 20, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.