Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/42584
Title: Constructability of segmental bridge
Authors: Leung, Chiu Kin.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1998
Abstract: Precast segmental construction techniques have been commonly employed for the construction of prestressed concrete bridge, flyover and viaduct in Europe since early 1960's. These techniques were subsequently spread to North and South America in 1970'. Given the high speed of construction, good quality of concrete product, great flexibility in span lengths, perfect fit in tight curve and minimal disruption to environment/traffic, these techniques have also been introduced into the Asian countries such as Thailand, Malaysia, Singapore, Laos, South Korea, Hong Kong etc. in the past ten years. This dissertation is to give a detailed account of the different segmental construction techniques for bridges and to look into a number of the recent and current prestigious projects in which the segmental construction techniques have been employed or are being employed.
URI: http://hdl.handle.net/10356/42584
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
LEUNG_CHIU_KIN_1998.pdf
  Restricted Access
22.92 MBAdobe PDFView/Open

Page view(s) 10

587
Updated on Dec 3, 2020

Download(s) 20

9
Updated on Dec 3, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.