Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/44184
Title: | Yard crane deployment in container terminals | Authors: | Tay, Teck Chin. | Keywords: | DRNTU::Engineering::Computer science and engineering::Computer applications::Physical sciences and engineering | Issue Date: | 2011 | Abstract: | In recent years, the shipping trades in Singapore increases tremendously and the resources of the container terminals have limited resources. To stay competitive, terminals have to utilize their resources efficiently. This project aims to help terminals to reduce the trucks waiting time in the storage yard by using a simulation approach and the improved least cost heuristic algorithm to deploy yard cranes to high workload block. This report will discuss the design and the result of the experiments using the original least cost heuristic algorithm and its improvements. From this project, it was found that the improvement using weighted scheme do improve the waiting time of the trucks and had the least vertical yard crane gantries. | URI: | http://hdl.handle.net/10356/44184 | Schools: | School of Computer Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | SCSE Student Reports (FYP/IA/PA/PI) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SCE10-0329.pdf Restricted Access | 1.46 MB | Adobe PDF | View/Open |
Page view(s) 20
743
Updated on Mar 20, 2025
Download(s) 50
23
Updated on Mar 20, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.