Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/44471
Title: | Biosorption by activated sludge | Authors: | Xu, Danni. | Keywords: | DRNTU::Engineering::Environmental engineering | Issue Date: | 2011 | Abstract: | This project proposes a contact tank prior to the aeration tank in conventional wastewater treatment plant (WWTP) for energy recovery purpose. The main function of the contact tank is to provide a suitable environment for rapid uptake of organic substrates by activated sludge. A physical sorption process during a short time period following the sludge/effluent contact is called biosorption, which occurs at the interface of the sludge/effluent and is defined by the amount of COD retained by biomass. | URI: | http://hdl.handle.net/10356/44471 | Schools: | School of Civil and Environmental Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Student Reports (FYP/IA/PA/PI) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
FYP final report_Xu Danni.pdf Restricted Access | 2.01 MB | Adobe PDF | View/Open |
Page view(s) 50
564
Updated on May 7, 2025
Download(s) 50
24
Updated on May 7, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.