Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/44471
Title: Biosorption by activated sludge
Authors: Xu, Danni.
Keywords: DRNTU::Engineering::Environmental engineering
Issue Date: 2011
Abstract: This project proposes a contact tank prior to the aeration tank in conventional wastewater treatment plant (WWTP) for energy recovery purpose. The main function of the contact tank is to provide a suitable environment for rapid uptake of organic substrates by activated sludge. A physical sorption process during a short time period following the sludge/effluent contact is called biosorption, which occurs at the interface of the sludge/effluent and is defined by the amount of COD retained by biomass.
URI: http://hdl.handle.net/10356/44471
Schools: School of Civil and Environmental Engineering 
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
FYP final report_Xu Danni.pdf
  Restricted Access
2.01 MBAdobe PDFView/Open

Page view(s) 50

564
Updated on May 7, 2025

Download(s) 50

24
Updated on May 7, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.