Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/47267
Title: Re-engineering for JIT information and materials handling : case for integrating systems
Authors: Loo, Wei Teck.
Keywords: DRNTU::Engineering::Manufacturing::Production management
Issue Date: 2003
Abstract: Just In Time (JIT), a methodology widely applied in supply chain management has its beginning as a management philosophy in manufacturing environment in the 1970s. Its application pre-requisites centres on waste elimination, quality at source, minimum set-up time, optimum process and continuous improvement. Notwithstanding the numerous documented benefits of JIT, there are limitations concerning differences in business context, demand pattern and cultural influences.
Description: 82 p.
URI: http://hdl.handle.net/10356/47267
Schools: School of Mechanical and Production Engineering 
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:MAE Theses

Files in This Item:
File Description SizeFormat 
MAE_THESES_83.pdf
  Restricted Access
11.75 MBAdobe PDFView/Open

Page view(s) 50

430
Updated on Jun 16, 2024

Download(s)

15
Updated on Jun 16, 2024

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.