Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/49283
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTan, Wilson Yongli.
dc.date.accessioned2012-05-16T09:02:38Z
dc.date.available2012-05-16T09:02:38Z
dc.date.copyright2012en_US
dc.date.issued2012
dc.identifier.urihttp://hdl.handle.net/10356/49283
dc.description.abstractThe trend to streamline construction efficiency and buildability has substantially increased the employment of precast concrete products on an international level. Private practitioners recognize that speedy and high quality manufacturing of structural components prior to erection will certainly reduce the high variable labor and time costs required for conventional building methods.en_US
dc.format.extent40 p.en_US
dc.language.isoenen_US
dc.rightsNanyang Technological University
dc.subjectDRNTU::Engineering::Civil engineering::Structures and designen_US
dc.titleBehaviour of precast concrete joints subject to a missing column scenerioen_US
dc.typeFinal Year Project (FYP)en_US
dc.contributor.supervisorTan Kang Haien_US
dc.contributor.schoolSchool of Civil and Environmental Engineeringen_US
dc.description.degreeBachelor of Engineering (Civil)en_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)
Files in This Item:
File Description SizeFormat 
FYP report 2012.pdf
  Restricted Access
FYP Report1.97 MBAdobe PDFView/Open

Page view(s)

489
Updated on Apr 15, 2025

Download(s) 50

27
Updated on Apr 15, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.