Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/4958
Title: | Solving constrained workload scheduling problems | Authors: | Ng, Mun Leong. | Keywords: | DRNTU::Engineering::Electrical and electronic engineering::Computer hardware, software and systems | Issue Date: | 2002 | Abstract: | The major contribution of this thesis are 1) Improved generation of initial schedules using code reuse mechanism. 2) Comparison of cooling schedules in a large constrained problem. 3) Improved cooling schedules. | URI: | http://hdl.handle.net/10356/4958 | Schools: | School of Electrical and Electronic Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | EEE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
EEE-THESES_940.pdf Restricted Access | 4.03 MB | Adobe PDF | View/Open |
Page view(s) 50
640
Updated on Mar 15, 2025
Download(s)
4
Updated on Mar 15, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.