Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/51047
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKellen.
dc.date.accessioned2013-01-03T03:51:12Z
dc.date.available2013-01-03T03:51:12Z
dc.date.copyright2012en_US
dc.date.issued2012
dc.identifier.urihttp://hdl.handle.net/10356/51047
dc.description.abstractToday, with the advancement of the production line, the queue time constraints become an important instrument to improve the product quality. Proper production control for time constraints not only secures product quality but also improves fabrication productivity. Achieving high utilization and low rework rate are the important objectives. A good control policy should maintain a balance between these two objectives. In order to achieve this goal, an approximation queuing model of two single servers with a fixed queue time constraint in between is been proposed. To understand the impact of this project, start from studying the performance of two single servers with fixed time constraint in between. The tandem queue is fed with jobs of a single product type and the service time is constant. In this project assume both servers suffer identically distributed time based pre-emptive interruptions. The objective will validate with an optimal queuing model using Matlab program. The Matlab program is to stimulate the queuing system with different combination of parameter set such as service time between station 1 and station 2, queue length, warm up size, sample size, material cost, mean time to failure (MTTF) and finally mean time to repair (MTTR). This report presents the analysis of the rework rate, loss rate and the safety (Work In Process) WIP level of the queuing system in order to minimize the production cost with considering the trade-off between rework rates and loss rates.en_US
dc.format.extent85 p.en_US
dc.language.isoenen_US
dc.rightsNanyang Technological University
dc.subjectDRNTU::Engineeringen_US
dc.titleOptimal control policy for two consecutive operations with time constraintsen_US
dc.typeFinal Year Project (FYP)en_US
dc.contributor.schoolSchool of Mechanical and Aerospace Engineeringen_US
dc.description.degreeBachelor of Engineering (Mechanical Engineering)en_US
dc.contributor.supervisor2Wu Kanen_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:MAE Student Reports (FYP/IA/PA/PI)
Files in This Item:
File Description SizeFormat 
mb030.pdf.pdf
  Restricted Access
1.89 MBAdobe PDFView/Open

Page view(s)

416
Updated on Apr 18, 2025

Download(s)

12
Updated on Apr 18, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.