Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/5152
Title: Report on industrial attachment with CS Bored Pile System Pte. Ltd
Authors: Liow, Ming Huey.
Keywords: DRNTU::Engineering::Civil engineering
Issue Date: 2004
Abstract: In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works.
URI: http://hdl.handle.net/10356/5152
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
CEE-REPORTS_7.pdf
  Restricted Access
7.25 MBAdobe PDFView/Open

Page view(s) 20

581
checked on Oct 22, 2020

Download(s) 20

60
checked on Oct 22, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.