Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/52670
Title: | Analysis of abutment scour | Authors: | Chua, Catherine Hui Min. | Keywords: | DRNTU::Engineering::Environmental engineering | Issue Date: | 2013 | Abstract: | Scouring is a major cause of failure of bridge foundations. It is important to determine the maximum depth of scour to estimate depth of burial of bridge footings to ensure structural safety. Five sets of long duration scouring experiments of up to 170.8 hours long were conducted to verify an equilibrium time prediction equation that was proposed by Nugroho (2006). The clear water scouring experiments were performed in a compound channel 19 m long, 1.6 m wide with a 1 m wide floodplain. The results were inconclusive. The accuracy of the prediction equation was off by more than 30% for four out of five sets of experiments. More data may be required to produce a more generalized equilibrium time prediction equation | URI: | http://hdl.handle.net/10356/52670 | Schools: | School of Civil and Environmental Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Student Reports (FYP/IA/PA/PI) |
Page view(s)
463
Updated on May 7, 2025
Download(s)
19
Updated on May 7, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.