Title: Precast installation productivity of HDB projects in Singapore
Authors: Shi, Fei.
Keywords: DRNTU::Engineering
Issue Date: 2013
Abstract: Productivity is one of the most frequently discussed topics in the construction industry. Productivity is closely related to costs and profits of projects. As precast construction method is widely used in Singapore HDB project, it is important to improve the precast installation productivity. Thus, the objective of this report is to find out the baseline productivity and average productivity for typical HDB project. In this report, loss of efficiency was been determined and the cause of the loss was fingered out. The most critical factors affecting precast installation productivity were discussed and suggestions were given to increase the effective man hours and productivity. Through this report, it is intended that contractors can use the information as an indicator to evaluate the efficiency of their precast installation work and to help in the planning of work schedules. This study is part of an ongoing research under supervision of Professor Robert Tiong and Mr. Ali Najafi (PhD Candidate).
URI: http://hdl.handle.net/10356/52846
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
Precast Installation Productivity of HDB Projects in Singapore (FYP by Faye Shi fei).pdf
  Restricted Access
main article2.1 MBAdobe PDFView/Open

Page view(s) 20

486
Updated on Oct 17, 2021

Download(s) 50

45
Updated on Oct 17, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.