Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/5301
Title: | Improvement of production logistics for semiconductor backend manufacturing | Authors: | Tng, Long Khim. | Keywords: | DRNTU::Engineering::Industrial engineering::Engineering logistics | Issue Date: | 2004 | Abstract: | The study focuses on determining the optimum lot size for the backend factory with the objective of achieving capacity increases with minimal equipment additions. The method used in the study describes the technical methodology and investigates an optimum lot size based upon given throughput and cycle time targets. The results of this study show that a larger lot size is very much desirable in the areas of the factory that are highly utilized. Small lot sizes will increase the number of setup for the machine, which will cause reduction in the output. The study also shows that different products will have a different lot sizes requirement because the processing time of the lot size will be different. | URI: | http://hdl.handle.net/10356/5301 | Schools: | School of Mechanical and Production Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MAE-THESES_1050.pdf Restricted Access | 6.97 MB | Adobe PDF | View/Open |
Page view(s) 50
543
Updated on May 7, 2025
Download(s)
11
Updated on May 7, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.