Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/5328
Title: Critical chain project control for fast track projects
Authors: Visvanathan Rajesh
Keywords: DRNTU::Engineering::Manufacturing::Production management
Issue Date: 2005
Abstract: The main objectives of this thesis are to review conventional Critical Path Method (CPM) and newly developed Critical Chain (CC) scheduling techniques, show how they can be applied through a case study, highlight the difference between the techniques and discuss the limitations of CC scheduling.
URI: http://hdl.handle.net/10356/5328
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:MAE Theses

Files in This Item:
File Description SizeFormat 
MAE-THESES_1075.pdf
  Restricted Access
5.02 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.