Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/53498
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Seow, Kelvin Jun Xiong. | |
dc.date.accessioned | 2013-06-04T06:25:58Z | |
dc.date.available | 2013-06-04T06:25:58Z | |
dc.date.copyright | 2012 | en_US |
dc.date.issued | 2012 | |
dc.identifier.uri | http://hdl.handle.net/10356/53498 | |
dc.description.abstract | The rate of project failures and the number of project disasters, considering the maturity and developments in project management, is baffling. Why do projects fail in such spectacular fashion? What were the root causes of these project disasters? How do we prevent the next “predictable surprise”? | en_US |
dc.format.extent | 126 p. | en_US |
dc.language.iso | en | en_US |
dc.subject | DRNTU::Engineering::Mechanical engineering | en_US |
dc.title | The causes and prevention of predictable surprises in complex projects | en_US |
dc.type | Thesis | |
dc.contributor.supervisor | Yeo Khim Teck | en_US |
dc.contributor.school | School of Mechanical and Aerospace Engineering | en_US |
dc.description.degree | Master of Science (Systems & Project Management) | en_US |
item.grantfulltext | restricted | - |
item.fulltext | With Fulltext | - |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SeowJunXiongKelvin12.pdf Restricted Access | 9.9 MB | Adobe PDF | View/Open |
Page view(s)
378
Updated on Sep 16, 2024
Download(s) 50
33
Updated on Sep 16, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.