Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/53498
Title: | The causes and prevention of predictable surprises in complex projects | Authors: | Seow, Kelvin Jun Xiong. | Keywords: | DRNTU::Engineering::Mechanical engineering | Issue Date: | 2012 | Abstract: | The rate of project failures and the number of project disasters, considering the maturity and developments in project management, is baffling. Why do projects fail in such spectacular fashion? What were the root causes of these project disasters? How do we prevent the next “predictable surprise”? | URI: | http://hdl.handle.net/10356/53498 | Schools: | School of Mechanical and Aerospace Engineering | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SeowJunXiongKelvin12.pdf Restricted Access | 9.9 MB | Adobe PDF | View/Open |
Page view(s)
378
Updated on Sep 16, 2024
Download(s) 50
33
Updated on Sep 16, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.