Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/54635
Title: Technical effectiveness of vacuum preloading-case studies
Authors: Fong, Kin Yip.
Keywords: DRNTU::Engineering::Civil engineering
Issue Date: 2013
Abstract: The report aims to inform the reader about current land reclamation procedures in the Tuas South project. At the same time, based on comparisons with two cases which are the TianJin XinGang port case as well as the Tuas South case incorporating the use of vacuum preloading, explores the viability of using a new type of method: the vacuum preloading method as a form of ground improvement in place of the traditional fill surcharge method.
URI: http://hdl.handle.net/10356/54635
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
C25.pdf
  Restricted Access
1.55 MBAdobe PDFView/Open

Page view(s)

375
checked on Sep 29, 2020

Download(s)

24
checked on Sep 29, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.