Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/5783
Title: Development of a prototype throughput management tool for electronics manufacturing
Authors: Heng, Yee Shuai.
Keywords: DRNTU::Engineering::Manufacturing::Production management
Issue Date: 2001
Abstract: The objective of this project is to design and develop a prototype throughput management tool for semiconductor manufacturing.
URI: http://hdl.handle.net/10356/5783
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:MAE Theses

Files in This Item:
File Description SizeFormat 
MAE-THESES_299.pdf
  Restricted Access
6.8 MBAdobe PDFView/Open

Page view(s) 5

199
checked on Oct 23, 2020

Download(s) 5

2
checked on Oct 23, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.