Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/5783
Title: | Development of a prototype throughput management tool for electronics manufacturing | Authors: | Heng, Yee Shuai. | Keywords: | DRNTU::Engineering::Manufacturing::Production management | Issue Date: | 2001 | Abstract: | The objective of this project is to design and develop a prototype throughput management tool for semiconductor manufacturing. | URI: | http://hdl.handle.net/10356/5783 | Schools: | School of Mechanical and Production Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MAE-THESES_299.pdf Restricted Access | 6.8 MB | Adobe PDF | View/Open |
Page view(s)
343
Updated on Mar 29, 2024
Download(s)
2
Updated on Mar 29, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.