Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/60522
Title: Total tardiness problem with future job arrival information
Authors: Huang, Fengjie
Keywords: DRNTU::Engineering::Manufacturing
Issue Date: 2006
Abstract: We consider a single machine total tardiness problem with different release times, different due dates and available information of future job arrival in the next time period W. The goal is to generate an effective schedule for minimizing total tardiness by utilizing the future job information.
URI: http://hdl.handle.net/10356/60522
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:SMA Theses

Files in This Item:
File Description SizeFormat 
Fengjie2006.pdf
  Restricted Access
Main Report1.15 MBAdobe PDFView/Open

Page view(s)

123
Updated on May 10, 2021

Download(s)

9
Updated on May 10, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.