Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/60564
Title: | Implement finite scheduling for downhole equipment product line using Adexa | Authors: | Guo, Yuming | Keywords: | DRNTU::Engineering::Manufacturing | Issue Date: | 2009 | Abstract: | Computer based scheduling systems have been becoming more and more popular in today’s manufacturing companies. These systems retrieve shop floor data from the Enterprise Resource Planning (ERP) systems and then create optimized finite capacity schedules, which reduce the manual scheduling effort significantly. Without such systems, the planners need to spend much more time to make the production schedules manually. In this thesis, the implementation of Adexa, which is a computer based scheduling system, was carried out in Schlumberger. This project focuses on the shop floor process modelling and data collection of the pump assembly process. The methodology of this project will be used as a framework to model the manufacturing process for other equipments and their components. | URI: | http://hdl.handle.net/10356/60564 | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | SMA Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Yuming2009.pdf Restricted Access | Main Report | 384.34 kB | Adobe PDF | View/Open |
Page view(s) 50
131
Updated on Jan 18, 2021
Download(s) 50
9
Updated on Jan 18, 2021
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.