Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/60574
Title: Optimization of steel plate planning for keppel FELS
Authors: Ni, Yang
Keywords: DRNTU::Engineering::Manufacturing
Issue Date: 2006
Abstract: Keppel FELS is one of the world leaders in offshore unit production and services. And steel plates are the most critical materials to Keppel FELS as their availability will determine the on-time completion and delivery of finished products which normally cost millions of dollars and customers cannot afford a delay while these critical pieces are being built or repaired and stop generating profits.
URI: http://hdl.handle.net/10356/60574
Schools: School of Mechanical and Aerospace Engineering 
Organisations: Keppel FELS
Research Centres: Singapore-MIT Alliance Programme 
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:SMA Theses

Files in This Item:
File Description SizeFormat 
NiYang2006.pdf
  Restricted Access
Main Report3.76 MBAdobe PDFView/Open

Page view(s) 50

487
Updated on May 7, 2025

Download(s)

6
Updated on May 7, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.